WHY.

[00:00:02]

HI Y'ALL.

MY NAME IS BRIAN SIMMONS.

I'M HERE IN THE DEPARTMENT OF PUBLIC WORKS.

THIS IS THE BID OPENING FOR THE A D A SITE IMPROVEMENTS AT ANTHONY F VETERAN PARK.

UM, ALL BIDS WERE TO BE RECEIVED BY THE TOWN CLERK UNTIL 2:00 PM ON THURSDAY, FEBRUARY 18TH, 2021, AT WHICH TIME THERE WILL BE PUBLICLY OPENED AND READ ALOUD ON THIS, UH, ZOOM CALL.

IT IS NOW 2 0 3 ON FEBRUARY 18TH, UH, 2021.

UM, IN GENERAL, THIS PROJECT CONSISTS OF CONSTRUCTION OF NEW A D A ACCESSIBLE CONCRETE STAIRS, CONCRETE RAMPS, WALKWAYS, HAND RAILS, AND MISCELLANEOUS SITE WORK AT ANTHONY F VETERAN PARK TO ACCESS THE MAIN SWIMMING POOL DECK.

UM, SO WE'LL GET STARTED WITH THE BID OPENINGS, SO IT'S JUST ME, SO IT MAY TAKE A LITTLE BIT OF TIME FOR ME TO OPEN EVERYTHING.

SO THE FIRST BID WE HAVE IS FROM CONTACT, CONTACT CONSTRUCTION TECHNOLOGY INC.

LOCATED IN CARMEL, NEW YORK.

I HAVE A BID BOND.

I JUST WANNA MAKE SURE THE BID BOND IS IN THE AMOUNT OF, UH, 5%.

OH, YES, IT IS.

SO 5% OF TOTAL BID.

THEY HAVE A TOTAL BASE BID OF $223,865.

FOR THE, UM, ALTERNATE BID PRICES I WILL GO THROUGH, UM, JUST SO EVERYBODY CAN SEE THOSE AS WELL.

UM, FOR ALTERNATE, UH, NUMBER GC DASH ONE, THERE WAS AN ALTERNATE PRICE OF $41,635.

FOR ALTERNATE ITEM GC TWO, THERE WAS A TOTAL ALTERNATE PRICE OF $25,000.

AND THEN FOR ALTERNATE ITEM GC THREE, THERE WAS A TOTAL DEDUCT OF PRICE AMOUNT OF $1,500.

ALL RIGHT, SO AGAIN, THAT BASE BID WAS 223,865 UM, DOLLARS.

ALL RIGHT, SO THAT IS NUMBER ONE.

BID NUMBER TWO IS FROM TONY SAL INC.

AGAIN, UH, BID BOND IN THE AMOUNT OF 5%, THEY HAVE A TOTAL BASE BID PRICE OF $177,000 AND 0 CENTS.

UM, ALTERNATE BID PRICE FOR ITEM GC DASH ONE WAS $37,000 AND 0 CENTS.

UH, FOR ALTERNATE ITEM GC DASH TWO $32,240 AND 0 CENTS.

AND THEN FOR, UH, GC DASH THREE, TOTAL DEDUCT ALTERNATE PRICE WAS $3,000.

SO AGAIN, THEIR BID PRICE FOR BASE BID WAS $177,000 AND 0 CENTS.

ALL RIGHT, BID NUMBER THREE COMES FROM PETER J LANDY, INC.

[00:05:02]

WHICH GROUP IS THAT? THE LAST ONE? WE'RE ON THE THIRD ONE NOW, RIGHT? THE THIRD ONE? YEAH, WE'RE ON THE THIRD ONE.

THIS IS PETER J LANDY, INC.

GOT IT.

UH, BID AMOUNT OF BID BONDS, SORRY, 5%.

THEY HAVE A TOTAL BASE BID OF $270,000 AND 0 CENTS.

UH, FOR ALTERNATE BID.

ITEM NUMBER ONE GC DASH ONE, THEY HAVE A TOTAL PRICE OF $80,000.

FOR GC DASH TWO, THEY HAVE A PRICE OF $25,000.

AND FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $2,000.

SO AGAIN, THEIR BASE BID PRICE WAS $270,000 AND 0 CENTS.

ALRIGHT, BID NUMBER FOUR COMES FROM JAB CO CONSTRUCTION IN SCARSDALE, NEW YORK.

HOW DO YOU SPELL IT? J A J A B L K O CONSTRUCTION L LOCATED AT 5 29 CENTRAL PARK AVENUE.

ALL RIGHT, SO THEY HAVE A TOTAL, UH, BID BOND FOR $300,000 IS WHAT IT SAYS.

OH, YOU LET HER OUTSIDE AGAIN, THEIR TOTAL BASE BID WAS FOR 200, UH, AND $5,000 AND 0 CENTS.

UH, FOR ALTERNATE BID PRICE GC DASH ONE, THEY HAD A TOTAL PRICE OF $50,000.

FOR GC DASH TWO, IT HAD A PRICE OF $40,000.

AND FOR GC DASH THREE, THEY HAD A TOTAL DEDUCT ALTERNATE PRICE OF $3,000.

SO AGAIN, THEIR BASE BID WAS $205,000 AND 0 CENTS.

NOW WE'RE ON TO BID NUMBER FIVE.

SO BID NUMBER FIVE IS FROM WERNER TO CONSTRUCTION MANAGEMENT.

L L C.

CAN YOU SPELL THAT AGAIN? YEAH, IT'S W E R N E R T CONSTRUCTION MANAGEMENT, L L C BASED OUT OF COSTCO, CONNECTICUT.

SO THEY HAVE A BID BOND FOR 5%.

THEY HAVE A TOTAL BASE BID OF $282,018 AND 0 CENTS.

UH, FOR ALTERNATE BID.

ITEM NUMBER ONE GC DASH ONE, THEY HAVE A TOTAL PRICE OF $48,975 AND 0 CENTS.

FOR GC DASH TWO, THEY HAVE A PRICE OF $21,721 AND 0 CENTS.

AND FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $2,178 AND 0 CENTS.

AND AGAIN, THEIR BASE BID PRICE WAS $282,018 AND 0 CENTS.

[00:10:01]

AND THE, UH, DEDUCT IS WHAT, 2001 71 OR DID I GET IT WRONG? THE DEDUCT FOR GC DASH THREE WAS $2,178 EIGHT 0 CENTS.

THANKS.

THAT WAS NUMBER FIVE.

NOW WE'RE ON TO NUMBER SIX.

GOT IT.

NUMBER SIX IS FROM STREAMLINE CONSTRUCTION BASED OUT OF BROOKLYN, NEW YORK.

SO THEY HAVE A BID BOND IN THE AMOUNT OF 5%.

THEY HAVE A TOTAL BASE, UH, BID PRICE OF $487,738 AND 0 CENTS FOR ALTERNATE BID PRICE.

ONE GC DASH ONE, THEY HAVE A TOTAL PRICE OF $54,100 AND 0 CENTS.

FOR GC DASH TWO, THEY HAVE A TOTAL BID PRICE OF $32,480 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $8,760 AND 0 CENTS.

AND AGAIN, THEIR TOTAL BASE PRICE WAS $487,738 AND 0 CENTS.

ALRIGHT, NOW WE'RE ON TO BID NUMBER SEVEN.

SO BID NUMBER SEVEN IS FROM ATECH CONCRETE THEY SAID OF EDISON, NEW JERSEY.

SO THEY HAVE A BID BOND AMOUNT OF 5%, AND AGAIN, THIS IS AEC CONCRETE COMPANY, INC.

OUT OF, UM, THIS IS EDISON, NEW JERSEY.

UH, TOTAL, UH, BASE BID PRICE IS $297,000 AND 0 CENTS FOR ALTERNATE BID PRICE.

ONE GC DASH ONE, THEY HAVE A TOTAL ALTERNATE PRICE OF $65,000 FOR ALTERNATE BID.

UH, GC DASH TWO, THEY HAVE A, UH, ALTERNATE PRICE OF $49,000 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $3,000.

SO AGAIN, THEIR TOTAL BASE PRICE WAS $297,000 AND 0 CENTS.

ALL RIGHT, SO NOW WE'RE ON TO BID NUMBER EIGHT.

AND THIS IS FROM AVANTI BUILDING CONSTRUCTION CORPORATION BASED THAT OF MOUNT VERNON, NEW YORK.

SAY THAT AGAIN.

UH, AVANTI BUILDING CONSTRUCTION CORPORATION BASED OUT OF, UH, MOUNT VERNON, NEW YORK.

SO

[00:15:01]

THEY HAVE A BID BOND IN THE AMOUNT OF 5% TOTAL BASE BID PRICE, 298,000, UH, DOLLARS AND 0 CENTS.

UH, ALTERNATE BID.

ITEM NUMBER ONE GC DASH ONE TOTAL ALTERNATE PRICE OF $58,000 AND 0 CENTS.

ALTERNATE, UH, GC DASH TWO, UH, TOTAL PRICE OF $52,200 AND 0 CENTS.

AND THEN FOR GC DASH THREE, TOTAL DEDUCT ALTERNATE PRICE OF $2,800 AND 0 CENTS.

SO AGAIN, THEIR BASE BID PRICE WAS $298,000 AND 0 CENTS.

ALL RIGHT, SO NOW WE'RE ON TO BID NUMBER NINE.

THIS ONE'S FROM ABBOTT AND PRICE INCORPORATED BASED OUT OF MILLWOOD, NEW YORK, ABBOTT.

AND PRICE, WHAT? ABBOTT AND PRICE INCORPORATED.

THANK YOU.

MILLWOOD, NEW YORK? NO.

ALL RIGHT.

SO THEY HAVE A BID BOND IN THE AMOUNT OF 5%, UH, TOTAL BASE BID PRICE OF $277,000 AND 0 CENTS.

UH, ALTERNATE BID PRICE FOR GC DASH ONE, UH, ALTERNATE PRICE IS $82,000 AND 0 CENTS.

ALTERNATE BID FOR GC DASH TWO WAS $31,700 AND 0 CENTS.

AND THEN FOR GC DASH THREE, UH, TOTAL DEDUCT ALTERNATE PRICE WAS $6,170 AND 0 CENTS.

AND AGAIN, THEIR TOTAL BASE BID PRICE WAS $277,000 AND 0 CENTS.

THAT WAS BID NUMBER NINE.

NOW WE'RE ON TO NUMBER 10.

NUMBER 10 IS FROM P C I INDUSTRIES.

WHICH, WHICH ONE? UH, WHAT'S THAT? I GOT IT.

I'M GOOD.

OKAY.

NOW THIS ONE'S FROM P C I, UH, INDUSTRIES CORP.

BASED OUTTA MOUNT VERNON, NEW YORK.

SAY THAT AGAIN.

P C I P C I INDUSTRIES INCARCERATION.

AND FROM WHERE? UM, MOUNT VERNON, NEW YORK.

ALL RIGHT.

SO THEY HAVE A BID BOND IN THE AMOUNT OF 5%.

THEY HAVE A TOTAL BASE BID PRICE OF $248,710 AND 86 CENTS.

UM, THEY HAVE A TOTAL FOR THE ALTERNATE BID PRICE.

UH, GC DASH ONE, UH, TOTAL ALTERNATE PRICE WAS $51,202 AND 2 CENTS FOR GC DASH TWO, TOTAL ALTERNATE PRICE OF $22,022,000, $22,008 AND 82 CENTS.

AND THEN FOR, UH, ALTERNATE, UH, GC DASH THREE, THEY HAVE A TOTAL DEDUCT DEDUCT AMOUNT OF $4,000 AND 0 CENTS.

SO AGAIN, THEIR BASE

[00:20:01]

BID PRICE WAS $248,710 AND 86 CENTS 10.

NUMBER 11 IS FROM PALADINO CONCRETE CREATIONS CORPORATION BASED OUT OF MOUNT VERNON, NEW YORK.

SPELL IT? PALADINO.

P A L P P P A L A D I N O.

CONCRETE CREATIONS COURT FROM MOUNT VERNON.

MOUNT VERNON.

SO THEY HAVE THE BID BOND IN THE AMOUNT OF 5%.

THEY HAVE A TOTAL BASE BID PRICE OF $182,950 AND 0 CENTS AND 50 CENTS AND NO CENTS.

OH, NO CENTS.

OKAY.

1 180 $2,950 AND 0 CENTS.

GOT IT.

FOR ALTERNATE BID, UH, GC DASH ONE, THEY HAVE A TOTAL PRICE OF $23,500 AND 0 CENTS.

FOR GC DASH TWO, THEY HAVE A TOTAL PRICE OF $29,000 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $4,000 AND 0 CENTS.

AND AGAIN, THEIR TOTAL BASE BID PRICE WAS $182,950 AND 0 CENTS.

SO NUMBER 12, SO THIS IS FROM COSTAS CONSTRUCTION, C O S T A S CONSTRUCTION BASED OUT OF YONKERS, NEW YORK.

SO THEY HAVE THE BID BOND AMOUNT OF 5% OF THE, THE TOTAL AMOUNT OF THE BID.

I HAVE A TOTAL BASE BID PRICE OF $247,750 AND 0 CENTS.

UM, THEY HAVE A, FOR ALTERNATE BID PRICES, GC DASH ONE, THEY HAVE AN ALTERNATE PRICE OF $35,567 AND 0 CENTS.

FOR GC DASH TWO, THEY HAVE AN ALTERNATE PRICE OF $39,550 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL, UH, DEDUCT ALTERNATE PRICE OF 1,800 HUNDRED DOLLARS AND 0 CENTS.

AND AGAIN, THEIR BASE BID PRICE WAS $247,750 AND 0 CENTS.

ALL RIGHT, NOW WE'RE ON TO 13.

SO BID NUMBER 13 IS FROM JC LAND AND SITE DEVELOPMENT, INC.

CAN YOU SPELL THAT? JC AND THEN LAND AND SITE DEVELOPMENT INC.

AND THEY'RE BASED OUT OF , NEW YORK.

OKAY.

JC LAND AND SITE INC.

OKAY.

[00:25:09]

HI.

I'M GONNA BE QUICK BECAUSE, UH, SO THEY HAVE A BID BOND IN THE AMOUNT OF 5%.

IT SAYS 5% OF AMOUNT BID NOT TO EXCEED TO $28,500.

THEY HAVE A TOTAL BASE BID PRICE OF $437,085 AND 0 CENTS FOR ALTERNATE, UH, BID PRICES.

GC DASH ONE, THEY HAVE AN ALTERNATE PRICE OF $12,500 AND 0 CENTS FOR GC DASH TWO HAVE AN ALTERNATE PRICE OF $43,750 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL, UH, UH, DEDUCT ALTERNATE PRICE OF, UH, $2,700 AND 0 CENTS.

AND AGAIN, THEIR BASE BID PRICE WAS $437,085 AND 0 CENTS.

RIGHT NOW WE'RE ON.

ALL RIGHT, SO NUMBER 14 IS FROM LAND V SCAPE.

SPELL THAT INC.

IT'S L A N D V SS, C A P E V.

SS C A P.

IS THAT ONE WORD? IT'S ALL ONE WORD, YEP.

LAND V S C A P, INC.

INC.

YEP.

WHERE ARE THEY FROM? IT ALSO SAYS, UH, NIKKI DIGGS EXCAVATION RIGHT NEXT TO IT.

AND THEY'RE BASED OUT OF LINCOLN, DALE, NEW YORK.

OKAY.

SO THEY HAVE THE BID BOND IN THE AMOUNT OF 5% AND THE AMOUNT OF BID, THEIR TOTAL BASE BID PRICE WAS, UH, $200,216 AND 60 CENTS.

200,000, $200,216 AND 60 CENTS.

16 CENTS.

60 CENTS AND 60 CENTS.

2 1 6 60.

GOT IT.

YEP.

2 0 0 2 1 6 60.

SO THEY HAVE, FOR ALTERNATE BID PRICES, GC DASH ONE, UH, THEY HAVE A ALTERNATE PRICE OF $12,278 AND 12 CENTS, $78 AND 12 CENTS.

SO 12 2 7 8 12, CORRECT.

YEP.

$12,278 AND 12 CENTS.

FOR GC DASH TWO, THEY HAVE A, UH, ALTERNATE PRICE OF $22,000 AND 0 CENTS.

22,000.

$22,000 0 CENTS.

GOT IT.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE AMOUNT FOR, UH, $1,700 AND 0 CENTS.

SO THE BASE BID IS $200,216 AND 60 CENTS.

CORRECT.

[00:30:01]

THAT WAS 14 TO BID NUMBER 15 BID NUMBER 15 IS FROM VERNON HILLS CONTRACT INCORPORATION.

OH, WHAT WAS THE LAST ONE AGAIN? THE LAST ONE WAS FROM LAND V SCAPE.

YEAH, WE DID THAT.

AND WHO'S THE NEXT VENDOR? I'M SORRY, I GOT INTERRUPTED.

THE NEXT ONE.

SO LAND SCAPE WAS NUMBER 14? YEP.

NUMBER 15, WHICH IS THIS ONE CURRENTLY? THIS IS VERNON HILLS CONTRACTING CORPORATION.

THEY'RE BASED OUT OF MOUNT VERNON, NEW YORK.

ALL RIGHT.

SO THEY HAVE THE BID BOND, THE AMOUNT OF 5%, 5% OF THE BID AMOUNT.

THEY HAVE A TOTAL BASE BID PRICE OF $171,350 AND 0 CENTS.

OKAY.

FOR ALTERNATE BID PRICE, NUMBER ONE GC DASH ONE, THEY HAVE A, UH, ALTERNATE PRICE OF $40,645 AND 0 CENTS.

UH, FOUR 40,600 AND WHAT, $40,645 AND 0 CENTS.

THANK YOU.

AND THEN FOR GC DASH TWO, THEY HAVE A TOTAL ALTERNATE, UH, PRICE OF $19,777 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $1,650 AND 0 CENTS.

AND AGAIN, THEIR TOTAL BASE BID PRICE WAS $171,350 AND 0 CENTS.

AND THEN FOR BID NUMBER 16, THIS ONE COMES FROM MORENO BROTHERS CORPORATION, UH, M O R A N O BROTHERS COURT BASED OUT OF CROTON ON HUDSON, NEW YORK.

SAY THAT AGAIN.

M O R N O? CORRECT.

CONSTRUCTION BROTHERS, CORP.

BROTHERS OR CONSTRUCTION? NO, I DON'T.

UM, I DON'T THINK CONSTRUCTION'S IN THERE.

IT'S JUST MARANO BROTHERS CORPORATION FROM CROTON HUDSON.

YEAH, IT'S JUST MARANO BROTHERS CORPORATION.

SO THEY HAVE THE, UH, BID BOND, 5% OF THE AMOUNT BID.

THEY HAVE A TOTAL BASE BID PRICE OF $345,000 AND 0 CENTS.

THEY HAVE FOR, UH, THE ALTERNATE BID PRICES FOR ALTERNATE GC DASH ONE.

THEY HAVE A TOTAL ALTERNATE PRICE OF $60,000 AND 0 CENTS.

FOR, UH, GC DASH TWO.

THEY HAVE AN ALTERNATE PRICE OF $15,000 AND 0 CENTS.

AND THEN FOR GC DASH THREE, THEY HAVE A TOTAL DEDUCT ALTERNATE PRICE OF $3,000 AND 0 CENTS.

AND AGAIN, THEIR TOTAL BASE BID PRICE WAS $345,000 AND 0 CENTS.

SO THOSE ARE THE 16 BIDS THAT WE

[00:35:01]

RECEIVED.

UM, AGAIN, WHAT I CAN DO IS I CAN JUST RUN DOWN THE LIST THAT I KEPT TRACK OF.

NUMBER ONE WAS CONTACT, UH, CONSTRUCTION.

THEIR BASE BID PRICE WAS $223,865 AND 0 CENTS.

BIDDER NUMBER TWO WAS TONY CASAL INC.

THEIR BASE BID PRICE WAS $177,000 AND 0 CENTS.

BIDDER NUMBER THREE WAS PETER LANDY, INC.

TOTAL BASE BID PRICE OF $270,000 AND 0 CENTS THAT ARE NUMBER FOUR WAS JAKO, J A B L K A O CONSTRUCTION.

THEIR BASE BID PRICE WAS $205,000 AND 0 CENTS.

BID NUMBER FIVE WAS WERNER CONSTRUCTION MANAGEMENT, L L C.

THEIR BASE BID PRICE WAS $282,018 AND 0 CENTS.

BIDDER NUMBER SIX WAS STREAMLINED CONSTRUCTION.

TOTAL BASE BID PRICE OF $487,738 AND 0 CENTS.

BIDDER NUMBER SEVEN WAS ATEC CONCRETE, UH, COMPANY, UM, THEIR BASE BID PRICE WAS $297,000 AND 0 CENTS.

BIDDER NUMBER EIGHT WAS AVANTI BUILDING CONSTRUCTION CORP.

BASE BID PRICE OF $298,000 AND 0 CENTS.

BIDDER NUMBER NINE WAS ABBOTT AND PRICE INC.

UH, BASE BID PRICE OF $277,000 AND 0 CENTS.

BETTER NUMBER 10 P C I INDUSTRIES CORP.

THEY HAD A TOTAL BASE BID PRICE OF $248,710 AND 86 CENTS BETTER.

NUMBER 11 WAS PALADINO CONSTRUCTION CREATION PALADINO CONCRETE CREATIONS CORPORATION, TOTAL BASE BID PRICE OF $182,950 AND 0 CENTS.

BID NUMBER 12 WAS COST US CONSTRUCTION TOTAL BASE BID PRICE OF $247,750 AND 0 CENTS.

BIDDER NUMBER 13 WAS JC LAND AND SITE DEVELOPMENT, INC.

TOTAL BASE BID PRICE OF $437,085 AND 0 CENTS.

BID NUMBER 14 WAS LAND V SCAPE INC.

TOTAL BASE BID PRICE OF $200,216 AND 60 CENTS.

BIDDER NUMBER 15 WAS VERNON HILL'S CONTRACTING CORPORATION.

TOTAL BASE BID PRICE OF $171,350 AND 0 CENTS.

AND THEN BIDDER NUMBER 16 WAS MURANO BROTHERS CORP.

TOTAL BASE BID PRICE OF $345,000 AND 0 CENTS.

SO THAT CONCLUDES THE BID OPENING FOR THIS UM, PROJECT.

AND AGAIN, THIS WAS FOR THE A D A SITE IMPROVEMENTS AT THE ANTHONY F VETERAN PARK.