[ TOWN OF GREENBURGH ANTENNA REVIEW BOARD 177 Hillside Avenue, Greenburgh, NY 10607 CATHERINE LEDERER-PLASKETT Chair ]

[00:00:03]

HI, THIS IS THE ANTENNA REVIEW BOARD MEETING AT THE TOWN OF GREENBURG ON THE ELE ON THE 10TH OF NOVEMBER, 2025 TO REVIEW TWO APPLICATIONS.

BEFORE WE PROCEED, LET ME TAKE ATTENDANCE.

CATHERINE LETTER OF SKE ME PRESENT, DIANE TORRA PRESENT.

THAT IS A QUORUM IN A PUBLIC PLACE, TOWN OF GREENBURG TOWN HALL.

LET ME TAKE THE, UM, TAKE THE REST OF ATTENDANCE.

FRANCIS SHEEN PRESENT.

MICHAEL SHERIDAN PRESENT.

OKAY, SO LET'S GET STARTED.

THIS APPLICATION WAS SUBMITTED ON THE 3RD OF NOVEMBER, 2025.

IT'S TODAY IS THE 10TH OF NOVEMBER, 2025 THAT WE ARE MEETING TO REVIEW IT.

SO IT IS SEVEN DAYS LATER.

UM, IF ANYONE SEES, YOU KNOW, HAS A DIFFERENT TAKE ON THE, WHAT I, WHAT I SEE, PLEASE, UH, INTERRUPT ME.

A IT SAYS NAME, ADDRESSES, AND QUALIFICATIONS OF PERSONS PREPARING THE REPORTS AND HIS OR HER OR THEIR SIGNATURES ATTESTING TO THE TRUTH AND COMPLETENESS OF THE INFORMATION CONTAINED THEREIN.

THE, THERE ARE TWO ISSUES FOR ME.

THE FIRST ONE IS THE SAME ISSUE THAT WE HAD ON FRIDAY WHEN WE REVIEWED ANOTHER APPLICATION.

IS THERE A LICENSE NUMBER FOR, UM, A LICENSE FOR THE RADIO FREQUENCY ENGINEER? UH, THAT IS CITED IN NUMBER THREE UNDER A, SO I MAYBE WERE ABLE TO GET THAT INFORMATION FROM, THERE'S NO, THERE'S NO LICENSE NUMBER.

HE IS NOT A PE BUT THERE, UM, AND I SPOKE TO HIM BRIEFLY AND I THINK SIMILAR TO WHAT THE OTHER RF CONSULTANT THAT PROVIDES AS A REPORT WITH THAT, UH, CERTIFICATION PAGE.

THAT LIST IS, UM, YOU'RE TALKING ABOUT, I'M TALKING ABOUT PAGE 42, RIGHT? APPENDIX A FOR THE REPORT CERTIFICATION.

HE CAN DO A SIMILAR, SIMILAR CERTIFICATION PAGE TO THAT, YOU KNOW, DEALING WITH HIS, HOW DOES IT COME THAT SOMEONE'S CALLED AN ENGINEER IF THEY'RE NOT? HE'S NOT, HE'S NOT A PE HE'S NOT A PROFESSIONAL ENGINEER.

IT'S JUST AN RF.

THERE'S NO, I I, MY UNDERSTANDING IS THERE IS NO SPECIFIC RF ENGINEER, SO THAT'S JUST LIKE MM-HMM .

A TITLE THAT PEOPLE ASSUME.

THAT'S MY UNDERSTANDING.

YES, WE WOULD LIKE THE CREDENTIALS THEN SOMETHING THAT CAN, SURE.

YES.

OKAY.

THE OTHER ISSUE THAT COMES UP AND IT COMES UP THROUGHOUT IS THE ADDRESS ON THE DRAWINGS IS DIFFERENT THAN THE ADDRESS ON EVERYTHING ELSE.

THIS ONE SAYS 6 0 9 NORTH CENTRAL NORTH, UH, SAW MILL RIVER ROAD AND OTHER THINGS SAY 6 0 9 SAW MILL RIVER ROAD.

SO, WE'LL, I'LL HIGHLIGHT IT AT DIFFERENT POINTS, BUT IT NEEDS TO BE ONE AND THE SAME.

UH, LET ME JUST WRITE HERE.

OKAY.

UM, THE NEXT ONE IS B AND IT SAYS NAME, ADDRESS, AND PHONE NUMBER, CELLULAR AND LANDLINE OF THE PROPERTY, OWNER, OPERATOR AND APPLICANT.

YOU HAVE THE O, THE PROPERTY OWNER, 6 0 9 SOMO RIVER OSMO, UM, REALTY, LLC.

UM, I HAVEN'T CHECKED WHETHER IT IS INDEED ONE WORD OR TWO WORDS, BUT THEN YOU HAVE, YOU DON'T HAVE THE OWNER OF THE POLE HERE.

YOU DID HAVE THE OWNER OF THE POLE AND THE APPLICATION YOU PROVIDED ON FRIDAY.

'CAUSE I WENT BACK TO SEE IF WE HAD LOOKED FOR THAT.

I THINK THAT'S TO GLOBAL SIGNAL ACQUISITION FOR, BUT IT SAYS OPERATOR LEASER.

IT DOESN'T SAY OWNER.

OKAY.

I'LL ADD OWNER.

THEY THE OWNER AS WELL, WHICH GETS TO ANOTHER POINT OF CONFUSION LATER ON WHEN IT'S CALLED CROWN AND WE DON'T HAVE A CONNECTION DRAWN, SO THAT'S INCOMPLETE.

UM, C HERE READS THE PROPERTY.

THE PROPERTY POSTAL ADDRESS IS 6 0 9

[00:05:01]

SAW RIVER ROAD.

SO THIS GOES TO THE ISSUE OF NEEDING IT TO BE THE SAME.

I HAVE THE ADDRESS ON THE APPLICATION VERSUS DRAWING IS DIFFERENT.

SO FOUR WITH, UM, D IS COMPLETE.

D IS COMPLETE.

IF YOU GO TO F IT'S THE SAME ISSUE WE HAD ON FRIDAY WITH THE AFFIDAVIT.

UM, THERE ARE TWO PARTS TO THIS THOUGH.

IF THE, SO IF IT SAYS IF THE INSTALLATION IS PURSUANT TO A LEASE AGREEMENT CONFIRMATION FROM THE LESSOR THAT THE LEASEE IS, IS AUTHORIZED TO UTILIZE THE PROPERTY, YOU SEND US TO, UM, EXHIBIT D 54.

PAGE 54.

IT SAYS ENCLOSED HERE WITH IS THE AFFIDAVIT OF OWNER SHOULD BE EXECUTED BY THE OPERATOR LEASER, WHICH AUTHORIZING THE APPLICANT TO MAKE THIS APPLICATION.

BUT AGAIN, IT DOESN'T SAY OWNER, IT SAYS OPERATOR.

SO WE NEED TO KNOW THAT THAT PERSON, THIS IS THE SAME THING WITH IT WAS THE PROBLEM IN B.

UM, SO ALSO IF YOU GO THERE TO D 54, JUST AS IT WAS WITH THE HARD STILL PARKING, IT HAS GLOBAL SIGN SIGNAL ACQUISITIONS BEING THE ONE WHO'S BEING DULY SWORN.

SO IT SHOULD BE REALLY JENNIFER BOCCE ON BEHALF OF, OR REPRESENTATIVE OF WHICH WAS WHAT WE HAD WITH THE HARD STILL PARKING ON FRIDAY.

OKAY.

YEAH.

OKAY.

SO IT SAYS THAT, LET'S LOOK AT THIS.

IT SAYS THAT, UM, AND THAT THE MAKE IS, IS AUTHORIZED AUTHORIZING VERIZON, BUT WE DON'T HAVE THE PROPERTY OWNER AUTHORIZING VERIZON.

SO WE NEED ALSO THE PROPERTY OWNER LIKE YOU DID.

YOU DID THAT ON FRIDAY.

HERE.

WE'RE ALSO RECORDING GRAND ENTRANCE.

.

I GOT STUFF UP.

UM, OKAY, SO WHAT DID WE SAY? WE SAID NAME CORRECTION AFFIDAVIT, PROPERTY OWNER PROOF THAT GLOBAL SIGNAL EQUALS CROWN.

IF THAT'S THE CASE, UM, THAT PROPERTY OWNER GRANTS VERIZON PERMISSION THAT THE AFFIDAVIT MUST READ ON BEHALF OF.

OKAY, SO THE 6 0 9, I CAN'T EVEN READ MY WRITING.

THEN.

UM, NAME CORRECTION ON AFFIDAVIT, WHICH IS PROOF THAT GLOBAL SIGNAL EQUALS CROWN BECAUSE WHEN WE GET TO THE PICTURES OF THE SITE, IT SAYS, WHEN I WENT UP THERE, IT SAID CROWN HAS THE ONES WITH THE SIGNS ON IT, SO I DON'T, UM,

[00:10:50]

SORRY, IT'S A LITTLE OF A MESS.

F IS INCOMPLETE.

OH, I WROTE IT ON HERE.

YOU DON'T GET THIS BACK.

SO I HAVE TO WRITE IT ALL OVER HERE.

THEN I WILL WRITE IT HERE AFTERWARDS.

UM, OKAY, G YEAH, BUT I HAVE NOTES ON IT.

IT SAYS, SHOWN ON THE PLAN, SUBMITTED HERE, HERE WITH THE MODIFICATIONS INVOLVED, REMOVING AND INSTALLING ANTENNAS AND OR RELATED EQUIPMENT ON THE EXISTING MONOPOLE WITHIN THE EXISTING COMPOUND AT THE BASE THEREOF.

INSTALL THREE ANTENNAS, REMOVE SIX ANTENNAS, INSTALL, UH, REMOVE SIX RRRH UH, UNITS ON EXISTING MOUNTS.

INSTALL SIX RRH UNITS ON EXISTING MOUNTS AND INSTALL THREE HYBRID CABLES.

SO YOU ARE NOT REMOVING ANY ANTENNA? NO, I'M SORRY.

NO.

OKAY, SO THERE WILL BE 12.

OKAY, SO THERE ARE SIX ANTENNAS THAT ARE REMAINING, CORRECT.

AND YOU'RE ADDING THREE MORE.

CORRECT.

AND YOU ARE REMOVING SIX RHS.

OKAY.

AND YOU'RE INSTALLING SIX, CORRECT? UM, QUESTION FOR YOU IS, IT SAYS EQUIPMENT LEGEND UP IN THE UPPER RIGHT CORNER.

MM-HMM .

WHERE DOES THAT COLOR CODING APPLY? I THINK IT APPLIES MORE TO THE NEXT PAGE.

I'M SORRY.

I THINK IT APPLIES MORE TO THE NEXT PAGE FOR THE COLORING.

SO IT SHOULDN'T BE ON THIS PAGE.

I CAN HAVE IT REMOVED ON THIS PAGE.

AND IF I GO TO THE NEXT PAGE,

[00:15:02]

I HAVE BLUE AND I HAVE ORANGE, BUT I DON'T UNDERSTAND HOW THE KEY WAS.

I THINK THE EXISTING IS JUST A, A, UH, BLACK OUTLINE.

THE NEW IS AN ORANGE OUTLINE AND UH, UH, PROPOSED AS THE BLUE OUTLINE.

OKAY.

THAT NEEDS TO BE BETTER EXPLAINED BECAUSE IT REALLY DOESN'T EXPLAIN WHY I HAVE GRAY IN THE MIDDLE.

YOU KNOW, DARK GRAY, LIGHT GRAY, NO GRAY BECAUSE HE GOT BLUE.

THAT DOESN'T FIT ANY OF THAT.

SO WE CAN DEAL WITH, WE CAN MARK G COMPLETE, BUT DEAL WITH THE KEY ON S BECAUSE THAT'S WHERE IT'S GONNA THANK.

OKAY, SO G IS COMPLETE.

OKAY, THEN WE HAVE DATA CERTIFICATE, AND YOU TELL US TO GO TO SEE EXHIBIT E 68.

YOU CAME ON AFTER SPRINT, RIGHT? UM, IT WOULD MAKE SENSE FOR SPRINTS AT THE TOP OF THE PAGE.

THAT'S MY UNDERSTANDING, BUT OKAY, SO YOU SAY I'M ON THE WRONG.

SO DID, DID LAUREL ACRE FARM SELL TO 6 0 9 SAWMILL, WHATEVER.

'CAUSE THE PARCEL OWNER HERE IS, THAT WOULD BE MY GUESS.

I MEAN, THIS IS FROM 1999, SO IT'S VERY POSSIBLE THIS, UM, SO I MARKED THAT AS COMPLETE BECAUSE IT IS FOR THE STRUCTURE.

I, I MARK COMPLETE JI MARK COMPLETE, AND KI MARK COMPLETE AND LI MARK COMPLETE AND MI MARK COMPLETE UNTIL I WENT TO THE SITE TODAY, I THOUGHT NEAR MIGHT BE COMPLETE THIS SITE AND I CAN SHOW YOU, BUT I SUGGEST YOU GO, THERE'S NO REFLECTION OF YOUR DRAWINGS AT ALL.

UM, AND WHEN WE GET TO THE OTHER ONE, THERE'S CAUSE FOR THAT TO BE AN ISSUE.

BUT THERE ARE MANY, MANY METAL CONTAINERS INSIDE THE FENCE AND THE NOT AND THE, UH, I WENT TO THE BUILDING DEPARTMENT BECAUSE THE HEIGHTS OF THE FENCES VARY FROM FIVE FEET TO SIX, MAYBE TO SEVEN FEET.

THAT'S NOT US TO MEASURE.

I DON'T SEE THEM.

THE, THE DRAWINGS ARE NOT CORRECTLY DISPLAYED.

UM, ACCORDING TO YOUR REPORT ON NEAR HERE, IF WE GO TO EXHIBIT B 47, CAN YOU TELL ME, CAN YOU EXPLAIN

[00:20:01]

TO ME 50 FEET? CAN I EXPLAIN TO YOU 50 FEET, LOOK AT WHAT VERIZON HAS AT 50 FEET.

THAT NUMBER FOUR, IT GOES FROM 1.2, THREE AND FOUR, AND THEN 2.87, AND THEN 4.47.

THAT'S, I, I CAN ASK THEM FOR THAT, BUT THAT'S WHAT IT COULD BE.

JUST, JUST, UH, WHEN WE GET TO THE OTHER ONE, YOU'LL SEE WHY THIS WAS PARTICULARLY CONCERNING TO ME.

BUT IF YOU CAN GET CLARIFICATION ON THAT, THAT WOULD BE GREAT BECAUSE IT DOESN'T SEEM, IF IT LOOKS LIKE SPRINT MAKES SENSE, IT GOES FROM ONE TO, YOU KNOW, IT GOES UP AND EVEN INCREMENTS AND THEN IT JUMPS.

BUT IT'S, IT'S CONSISTENT.

BUT THIS GOES FROM 1.23 TO FOUR TO 2.87 TO 4.47.

AND THERE'S SOMETHING IN THIS THAT WOULD DRAMATICALLY IMPACT THE GENERAL POPULATION RESULTS ALSO.

SO IF YOU CAN CLARIFY, I'LL GET CLARIFICATION.

JUST, I MEAN, FOUR IS STILL VERY, VERY RELEVANT.

IT HAS NOTHING TO DO WITH, IT HAS NOTHING TO DO WITH WHAT THE LEVEL IS.

IT HAS TO DO WITH THE FACT THAT I AM READING MORE AND MORE OF THESE CHARTS AND WE JUST WENT THROUGH APPLICATIONS FROM ANOTHER PROVIDER.

THEY WERE TOTALLY MANUFACTURED IN MY OPINION.

AND WHEN YOU SEE WHAT YOU, WHAT'S ON THE NEXT APPLICATION THAT COMES FROM, UM, COMES FOR THE THREE 13, YOU'LL UNDERSTAND WHY THERE'S CONCERN THAT THESE BE ACCURATE.

YOU CAN'T MAKE A CONCLUSION IF THEY'RE NOT, YOU CAN'T MAKE A CONCLUSION, BUT IT WOULD BE INCORRECT.

SO IT COULD BE INCORRECT.

UM, SO THIS THEN WE'RE UP TO O THREE IS COMPLETE 'CAUSE THAT'S, YOU KNOW, OF, OF NEAR, UM, THEN CERTIFICATION THAT THE PROPOSED ATTENDANCE WILL NOT CAUSE INTERFERENCE IS COMPLETE.

UM, WE NEED A PROFILE.

YOU, THIS IS EVEN LET WE READ IT.

IT JUST SAYS THAT THEY'RE, THEY MEET THE NOISE REQUIREMENTS AS SUCH WILL NOT EXCEED.

IT DOESN'T EVEN BOTHER TO TRY AND GIVE AN EXPLANATION.

UM, THEN WE HAVE PROPOSED SCHEDULED FOR INSTALLATION.

JUST LIKE LAST WEEK.

WE, ON FRIDAY WE'RE ASKING FOR A TARGET DATE BECAUSE ALL OF THESE WENT THROUGH ONCE OR MANY OF THESE DID AND THEY NEVER HAPPENED.

SO IT REALLY SHOWS THAT NOBODY'S BEEN TO THE SITE.

THE ANSWER FOR R BECAUSE IT SAYS THE COLOR, IT SAYS THE EXISTING FACILITY CONCEALMENT ELEMENTS INCLUDING THE ANTENNA COLOR AND FENCING OF THE PROPERTY, THE COLOR OF THE PRO PROPOSED ANTENNAS.

AND AS DETAILED ON PAGE C FOUR OF THE PLAN IS SNOWBANK TO MATCH THE COLOR OF EXISTING ANTENNAS.

MOREOVER, THE FENCE SURROUNDING THE COMPOUND CURRENTLY DOES NOT HAVE A PRI A PRIVATE SYSTEM.

NO, IT HAS TREES.

IT HAS TREES ON TWO THIRDS OF IT AND THE OTHER SIDE IS OVERGROWN AND A DISASTER.

BUT IT HAS TREES THERE ON THE SIDE FACING THE GAS STATION.

SO NOBODY BOTHERED TO LOOK.

[00:25:17]

WHAT I'M WRITING HERE IS THERE ARE TREES ON ONE SIDE, THE FENCE IS MULTIPLE HEIGHTS.

THE INTERIOR IS OVERGROWN AND FILLED WITH APARTMENT STRUCTURES.

SO WHAT IS WRITTEN HERE IS JUST WHAT GETS WRITTEN, IT SEEMS TO ME.

SO LOOKING AT A PLAN, ILLUSTRATING THE APP, APPROXIMATE LOCATION, SIZE.

UM, ONE OF THE THINGS, AND I, THIS IS THE OTHER THING THAT TOOK ME TO THE BUILDING DEPARTMENT, IS WE HAVE, SINCE THE DAY WE WROTE THIS LAW, WE DO NOT ALLOW BILL, UM, CLIMBING, WHAT DO THEY CALL CLIMBING? FRANCIS SPOKE SPOKES.

THIS DOESN'T JUST HAVE SPOKES, IT HAS STEPS ALL THE WAY TO THE TOP.

AND IT HAS TWO PLACES WHERE THERE ARE OTHER STEPS.

AND IT HAS A LAYER OF A, OF A PLATFORM BY A FIVE FOOT FENCE.

THAT IS EXACTLY WHERE YOU'D HAVE TO STAND TO GET ONTO THOSE.

SO THAT'S NOT OUR JURISDICTION, BUT IT SURE AS HECK IS THE BUILDING DEPARTMENTS.

AND I JUST WANT YOU TO KNOW THAT THIS IS LIKE ONE OF THE BIGGEST NO-NOS WE HAVE BECAUSE THIS IS A, THIS ENTICES KIDS TO CLIMB AN ATTRACTIVE NUISANCE THAT THEY CAN CLIMB THE BOAT.

NUISANCE THE NUISANCE FACTOR.

SO IN LOOKING AT THE DRAWINGS, I HAVE LOTS OF QUESTIONS.

S WE'LL START WITH EASY ONES.

UM, WHICH, AND THE END, THE LIGHTING, LIKE LAST TIME THERE IS LIGHTING REFERENCED.

, IS THERE LIGHTING AND IS IT GOING TO CHANGE? IT SAYS VERIZON WORK LIGHT ON AND TIMER SWITCH.

SO IF IT'S GONNA STAY THE SAME, WHAT WAS THE LANGUAGE WE HAD? WE HAD LANGUAGE THAT SAID, WELL THIS SAYS NO NEW LIGHTS ARE PROPOSED.

IT SAYS, IS INDICATED ON SHEET C ONE OF THE PLANS.

WHERE IS THAT? THERE ARE SIX EXISTING LIGHTS ON A TIMER SWITCH.

NO NEW LIGHTS ARE PROPOSED.

WHERE IS THE THAT'S IN THE ANSWER.

THE LAST SENTENCE.

OKAY, GOOD.

OKAY.

SIGNAGE.

THESE ARE THE EASY ONES.

WHEN I WENT AND YOU'VE BEEN UP THERE AND YOU'VE BEEN UP THERE SINCE WE HAD THIS SIGN REQUIREMENT, IT SAYS THAT YOU HAVE TO PUT UP A SIGN THAT FITS THE TOWN.

AND THE ONE AT THREE 13 ONLY HAS ONE FOUND.

I HAVE TO LOOK AT MY PHONE NOW TO SEE IF I HAVE THE PICTURES FROM THIS ON ONE SIDE THERE TANKS.

THAT'S FROM THE GAS STATION.

MM-HMM THIS IS WHAT I'M TALKING ABOUT.

IT'S LIKE THERE'S NO WAY YOU CAN, OKAY, SO THERE'S, THIS IS ONE SIGN THAT'S THERE.

MM-HMM THIS IS THE OTHER SIGN THAT COMES FROM CROWN AND THEY'RE ON THIS WALL NEXT TO EACH OTHER ON THIS GATE.

BUT THERE IS NOTHING THAT I FOUND THAT IS OUR TOWN REQUIRED SIGN.

SO TO ME IT INDICATES THAT WE MAY REQUIRE IT, BUT NOBODY'S ABIDING BY IT.

SO WHAT DO YOU HAVE WRITTEN HERE ABOUT SIGNAGE? SO WE HAVE THE PROPOSED SIGNAGE IS WHAT, WHAT IS REQUIRED AND IT'S TO BE LOCATED.

IT'S THE ZEN FOR NEW LOCATED ON THE, UH, FENCE GATE, PAGE C FIVE SHOWS WHAT THE SIGNAGE IS.

PAGE C ONE SHOWS WHERE IT'S TO BE LOCATED.

SO I'M JUST GOING ON THE RECORD THAT I'M GONNA TRY AND FIND A WAY TO MAKE SURE THESE ARE ENFORCED BECAUSE THIS IS OUTRAGEOUS THAT I GO TO THE SITES THAT WE WORK SO HARD TO MAKE SURE THAT EVERY I IS DOTTED AND PEOPLE GET PERMITS AND THEN NOTHING HAPPENS.

[00:30:10]

SO WE NEED THE COLOR OF THE APP, PERTINENT STRUCTURES AS WELL, NOT JUST THE COLOR OF THE ANTENNA.

DO YOU HAVE THAT SOMEPLACE? AND I MISSED IT.

I MEAN WE HAVE THE RADIO, THE RHS, WHICH ARE WHAT'S ANTENNAS AND THE RHS ARE GONNA BE PUT UP THERE.

YOU NEED THE I PERTINENT STRUCTURES.

OKAY.

NOW IN LOOKING AT C TWO, WE HAD A CONVERSATION ON FRIDAY ABOUT USING THE TERM EQUIPMENT INDISCRIMINATE INDISCRIMINATELY AND AT DIFFERENT POINTS ON HERE TO BE REMOVED AND UNDERNEATH IDENTIFIES WHAT IT'S ANTENNAS ARE NOT, HAVE NOT BEEN CALLED EQUIPMENT.

MS. FRANCIS POINTED OUT LAST FRIDAY.

BUT YOU'RE PUTTING YOUR EQUIPMENT IDENTIFICATION UNDERNEATH IT.

UM, ON THIS IT DOES NOT TELL US WHO OWNS THE TOWER IS.

OKAY, I JUST WANNA MAKE SURE BECAUSE OF THIS, THE EQUIPMENT UNDER THERE, YOUR NETWORK, IT WORKS WELL.

IT, IT IS IN THE FUTURE GET RID OF THE TERM EQUIPMENT AND I JUST IDENTIFY IT BECAUSE IT GETS CONFUSING.

'CAUSE THAT'S NOT HOW WE IDENTIFY IT IN THE CODE.

AND IT'S NOT, IT'S NEW TO THIS, THESE, THIS SET OF THREE APPLICATIONS IN THE PAST YOU IDENTIFIED AND YOUR OFFICE IDENTIFIED ANTENNAS AS ANTENNAS AND DIDN'T SUBCATEGORIZE THEM.

UM, IN, LEMME JUST GO OVER THE QUESTIONS.

CROWN CASTLE, UM, WHAT, WHO UP ON THE TOP, ON THE LEFT OF THIS PAGE, IT SAYS CENTER LINE OF CROWN CASTLE AND 10 MOUNT IN THE RF REPORT IT IDENTIFIES THE TOP AS SPRINT.

UM, YOU'RE, IT IS CONFUSING TO KNOW, FIRST OF ALL YOU'RE ALSO MISSING AN N BUT WHO OWNS THIS? IS THIS SPRINT? 'CAUSE THAT'S WHAT IT IS IN THE, IN THE RF REPORT.

I'LL CONFIRM THAT.

MY GUESS IS IT'S SPRINT EQUIPMENT THAT WAS LEFT UP THERE.

THAT'S NOW ON 'CAUSE SPRINT IS NO LONGER OKAY.

WE DON'T GUESS.

THANK YOU.

SO I WILL OBJECT.

SO THEN WE GO OVER TO THE OTHER SIDE AND, AND YOU'RE USING INITIALS.

AND IF THAT'S THE CASE, WE NEED LET'S, LET ME LEAVE IT LIKE THAT FOR RIGHT NOW.

SO THE RF REPORT NEEDS TO MATCH WHAT YOUR DRAWINGS SAY.

YOUR DRAWINGS DON'T REFLECT THE POLE BECAUSE THERE ARE CLIMBING SPOKES AND THERE IS A HUGE STRUCTURE HERE THAT IS RIGHT BY THE POEM, BY THE CLIMBING, CLIMBING SPOKES.

THE, THE ENCLOSURE DOES NOT MATCH THE ENCLOSURE THAT I SAW WHEN I WENT THERE TODAY.

WHAT IS IN THE DRAWING ON THE LEFT SIDE OF THE ENCLOSURE THAT YOU HAVE?

[00:35:14]

THAT WOULD BE THE GENERATOR.

VERIZON'S GENERATOR.

I DON'T SEE IT IDENTIFIED ON THESE DRAWINGS.

I DON'T SEE THE HEIGHT, I DON'T SEE WHO OWNS IT.

I DON'T SEE WHAT IT IS.

THE RIGHT, THE THIRD ONE DOWN SAYS TOP OF EXISTING VERIZON GENERATOR 72 INCHES ABOVE GROUND LEVEL 2 54.

WHERE, WHERE THAT'S YEAH, BUT THAT'S ON THE OTHER SIDE.

WHAT IS THIS OVER HERE? NO, THAT'S ON, THAT'S ON THAT SIDE.

THEY JUST HAVE ALL THE HEIGHTS ON THE RIGHT.

THAT'S NOT CLEAR.

THAT DOESN'T WORK.

YOU HAVE HEIGHTS ON THE OTHER SIDE.

SO WHY WOULD WE THEN GO SWITCH OVER FOR THAT? THEY JUST HAVE, THAT'S THE WAY THEY PUT IT.

THEY PUT ALL THE HEIGHTS.

I'M JUST EXPLAINING THAT THAT'S BUT THEY PUT ALL THE HEIGHTS ON THE RIGHT SIDE.

WELL PLEASE CORRECT THAT BECAUSE IT DOES NOT CLEARLY IDENTIFY AND YOU'LL HAVE TO CORRECT IT ANYWAY BECAUSE THE PLACE IS PACKED.

DEFENSE HEIGHTS ARE DIFFERENT AT DIFFERENT SPOTS.

WHAT ELSE DO I CORRECT? THE KEY GONNA CORRECT THE ADDRESS ON THE, OKAY, IN THE TOP OF THE DRAWING WHERE IT SAYS CASTLE ANTENNA MOUNTS AND IT POINTS TO THE TWO LARGE PIECES, THE LARGE ANTENNAS ON THE SIDE.

WHAT ARE UNDERNEATH THEM? CAN I THOSE, SORRY.

PROBABLY THEIR RHS OR WELL WE NEED THEM IDENTIFIED AND THEIR HEIGHT AND THEIR OWNERSHIP.

I MEANT TO ASK, DID WE DO THIS WHERE THE MATERIALS WERE? I WROTE IT HERE BECAUSE I DON'T, I'M WHAT'S, I'M SORRY, WHAT? UH, THE MATERIAL, BECAUSE IT SAYS IN THIS THAT ONE OF THE THINGS IS MATERIALS, TWO LEVEL MATERIALS.

AND I KNOW WE HAVE IN ANOTHER SECTION, BUT HERE THE MATERIALS OF THE EQUIPMENT BEING INSTALLED, IT SAYS ON THIS, YOU AND I SHOULD PLAY PART RIGHT NOW, INCLUDING HEIGHT ABOVE TRO GRADE, ELEVATION ABOVE GRADE AND C LEVEL MATERIALS.

IT SHOULD PLAN, SHOULD INCLUDE A DESCRIPTION OF THE ANTENNAS AND ALL RELATED FIXTURE STRUCTURES, S AND APPARATUS INCLUDING HEIGHT ABOVE OOD GRADE, BLAH, BLAH, BLAH.

UM, THE MATERIALS ARE ON C FOUR AND THOSE ARE THE FOR ALL PARTS.

THE DEPARTMENTS THE APPARATUS BUT AMOUNT, NOT THE DETAIL.

SHOW ME THE APARTMENTS ON HERE.

SORRY, IN CASE I'M MISSING IT.

WELL WHAT DO YOU MEAN BY APARTMENTS? WELL THE APARTMENTS MEANING THE STRUCTURES ON THE GROUND OTHER THAN THE EXISTING IS THAT VERIZON'S EXISTING STRUCTURES.

OKAY.

[00:40:10]

THEY DID THE NEW EQUIPMENT.

SO I'M SORRY THEY DID THE NEW EQUIPMENT.

WHAT WHAT THE MATERIALS ARE, THE NEW EQUIPMENT.

AND THIS HAS ALWAYS APPLIED TO ALL THE STUFF ON THE, IT SAYS THAT IN THE VERY BEGINNING, ALL PROPOSED AND EXISTING, IT'S THE VERY FIRST LINE.

OKAY? SO IN MY OPINION THIS IS INCOMPLETE T ALL WIRELESS FACILITIES, WE WOULD KNOW WHAT IT SAYS AND IT SAYS INFORMATION INCLUDED THAT THEY, UM, AND YOU'RE SAYING ON C FOUR IS IT THAT YOU SAID C FIVE.

OKAY.

GRADE LEVEL, ANYTHING COMPLETE AND I SAID ANYTHING ABOUT THE INSURANCE BEFORE, LET'S NOT VOTE ON THIS ONE UNTIL HE COMES BACK ABOUT THAT, ABOUT THE INSURANCE.

HE'S TRYING TO DO TWO THINGS.

OKAY.

AND NOW LET'S GO ON TO THE OTHER ONE.

SO THE NEXT ONE IS THREE 13 CENTRAL, BETWEEN 13 CENTRAL PARK AVENUE AND OH GOOD, HE IS BACK.

DID YOU HAVE A CHANCE TO LOOK AT THE INSURANCE BEFORE? I DID.

AND IT HAS LANGUAGE THAT WE, WE DON'T ACCEPT.

UM, IT SAYS TOWN OF GREENBURG IS INCLUDED AS AN ADDITIONAL INSURED GENERAL LIABILITY IF REQUIRED BY THERE'S NO, IF IT IS REQUIRED BY THE, BY THE LAW.

UH, AND IT SAYS PERFORMED BY THE NAMED INSURED AND INSURED.

I DON'T KNOW IF THE TOWN ATTORNEY'S GONNA ACCEPT THAT CAVEAT AT THE END AS WELL.

WHAT DOES IT SAY? THINK IT SAYS IF REQUIRED BY WRITTEN CONTRACT FOR WORK PERFORMED BY THE NAMED INSURED.

SO THEY REMOVE IF AFTER, IF THAT WOULD BE ACCEPTABLE, RIGHT? IF YOU TAKE UH RIGHT.

GENERAL LIABILITY, WHICH I THINK IS WHAT YOU HAD, RIGHT? YEAH.

THIS IS A DIFFERENT COMPANY.

SO WE MOVED FROM IF ON, IF ON, YEAH.

[00:45:01]

IS THE OTHER ONE THE SAME THING? IF THAT'S UNDER WORKMAN'S COMP AND PROPERTY CERTIFICATE OF LIABILITY INSURANCE, THAT'S REALLY WHAT MATTERS.

OKAY, SO IT'S THE, IT'S THE THIRD ONE.

ORDINANCES COMP IS OKAY.

UH, YEAH.

YES, YES.

CORRECT ME MY GRAMMAR AND PROPERTY INSURANCE FOR PROPERTY REPLACEMENT COSTS.

YEAH.

AND THIS ONE DOESN'T SAY ANYTHING ABOUT ADDITIONAL INSURED.

SO IT DOESN'T INCLUDE IT AT ALL? NO, IT JUST SAYS DESCRIPTION OF OPERATIONS AND AS IT'S BLANK, THAT'S FOR THE OTHER ONE.

SO THAT IS NOT ACCEPTABLE EITHER.

WE JUST HAVE TO GET TO THE RIGHT PAPER AT THE TOP.

IT SAYS IF IT DOESN'T SPECIFICALLY STATE ADDITIONALLY INSURED DO NOT ADDITIONALLY INSURED.

SO IN THE DESCRIPTION OF OPERATIONS THEY NEED TO SAY WERE ADDITIONALLY INSURED BUT WORKMAN'S COMP IS OKAY ON THAT.

YEAH.

AND THAT IS UNDER, UH, THE GENERAL COMMERCIAL GENERAL LIABILITY IS INCOMPLETE.

ADD A LITTLE BOX.

UM, WORKMAN'S COMP IS OKAY.

PROPERTY INSURANCE FOR REPLACEMENT.

YEAH, WE DON'T, THE LAW REALLY LIMITS US TO GENERAL LIABILITY.

SO THAT'S ALSO COMPLETE 'CAUSE WE HAVE THAT.

OKAY, NOW SHE LEFT.

WE EVERY TIME ABOUT TAKE A BOAT, SOMEBODY'S LIKE, OKAY WE CAN, WE'LL BOTH, YOU CAN TAKE THE VOTE AND YOU CAN WE'LL GET WHAT YOU COULD GO ON TO THE NEXT ONE.

YEAH, THAT'S WHAT WE WERE DOING WHILE YOU WERE OUT OF THE ROOM.

WE GOING ON THE NEXT ONE? SO NOW WE'RE UP TO THREE 13 CENTRAL AVENUE AND WE'VE NOW ESTABLISHED ON THE FIRST ONE THAT, HOW DID WE WRITE IT? WE WROTE THAT, UH, WE NEED CREDENTIALS.

OKAY, IF YOU LOOK AT B IT SAYS PROPERTY OWNERS AP WIRELESS INVESTMENTS.

LLC.

YOU LOOK AT YOUR DRAWINGS, IT SAYS PROPERTY OWNER COLONIAL PROPERTIES LLC.

SO WE NEED, OKAY, THEN IT SAYS THE OPERATOR LESSER IS CROWN ATLANTIC COMPANY WHO OWNS THE POPE CORNER? OKAY, C IS COMPLETE.

D IS COMPLETE.

E IS COMPLETE F WE HAVE THE SAME ISSUE.

AGAIN, IF YOU LOOK AT, YOU SEND US TO C EXHIBIT D, PAGE 76.

[00:50:12]

THIS IS A DIFFERENT, THIS OWNERSHIP ISSUE AGAIN BECOMES PROBLEMATIC.

WHOSE AP WIRELESS? UM, AND THEN YOU NEED SOMEBODY SIGNING ON BEHALF OF, ON BEHALF OF, AND THEN IT SAYS HERE, AP WIRELESS GIVES VERIZON PERMISSION, RIGHT? MM-HMM .

SO DOES AP WIRELESS OWN THE POLE? I'LL CHECK IT.

THE UNDERLYING, I DON'T THINK SO.

I THINK CROWN OWNS THE POLE.

SO WE NEED SOMETHING FROM CROWN THAT SAYS THEY GIVE PERMISSION TO VERIZON AS WELL.

AND IF THEY DON'T, THEY HAVE AN AWFUL LOT OF SIGNS UP THERE.

CAN WE JUST TAKE, SO I KNOW THIS IS TOTAL MORNING IN PROGRESS.

THE, OKAY.

UM, UH, CAN I HAVE A VOTE ON DEEMING? I, I MOVED THAT 6 0 9 PALM RIVER ROAD BE DEEMED INCOMPLETE.

I NEED A SECOND.

SECOND.

ALL IN FAVOR? THAT WAS THE ONE WE JUST DID.

ALL IN FAVOR? YEAH.

OKAY.

YEAH.

OKAY.

UNANIMOUS AND COMPLETE.

I'LL GO THROUGH AND MAKE THE NOTES AFTERWARDS, BUT I JUST WANTED TO GET THAT SO I CAN PUT THIS TO THE SIDE.

AND NOW ON THESE DRUMS, SO YOU ALSO HAVE WINDOWS HERE ON CASTLE SITES, SO IT DOESN'T LIKE WITH SUCH INCONSISTENCY.

OKAY, SO GO TO PAGE.

OKAY, YOU HAVE ON THE, I'M LOOKING AT PAGE C TWO, AT THE TOP OF THE RIGHT COLUMN IT SAYS VERIZON EQUIPMENT TO BE RELOCATED TO WHERE? WELL, THAT'S SHOWN ON C3.

I'M SORRY.

THAT'S SHOWN ON C3.

THAT'S NOT BEING REMOVED.

IT'S JUST BEING RELOCATED.

YEAH, BUT RELOCATED COULD BE ANYWHERE ON THE POLE.

SO SHOULDN'T THERE BE SOME EXPLANATION WHEN YOU SAY THAT SINCE WE'RE IN THE JOB DESCRIPTION, WE'RE IN THE DESCRIPTION OF WORK BEING DONE, IT'S, UH, RELOCATE THREE EXISTING OR EXISTING MOUNT.

SO IF YOU CAN CLARIFY WHAT THAT IS.

THANK YOU.

THANK YOU.

WHAT ARE THESE ANTENNAS?

[00:55:06]

OKAY, ON THE RIGHT SIDE OF C TWO ON THE LEFT SIDE OF THAT MONOPOLE, AND I CAN JUST BE MISSING IT.

IT SAYS IT STARTS WITH THE TOP OF THE STRUCTURE WITH THE PERS, WHICH THAT'S GRAMMATICALLY JUST UNCLEAR.

'CAUSE THAT WHY DOES THE POLE HAVE A PERS IT ITSELF? THE PERS WOULD BE AT THE BOTTOM OF THE POLE, RIGHT? WELL, I MEAN THE PERMITS OR ANYTHING RELATED TO THE, TO THE INSTALLATION.

BUT WE'VE BEEN CALLING THEM ANTENNAS, RIGHT? WELL, THEY CAN BE ANTENNAS, IT CAN BE MOUNT, IT CAN BE A, THE MOUNTING EQUIPMENT.

LET'S NOT PICK THAT FIGHT.

OKAY? OKAY.

THEN IT SAYS VERIZON ANTENNA CENTRAL LINE.

MM-HMM .

SO THEN COULD SHE, I'M GONNA, I'M GONNA WATCH FROM THE, SO THEN WE HAVE THE TOP OF THE TOWER AND THEN WE HAVE MOUNT VERIZON AND MOUNT CENTER LINE.

UH, UH, IS THAT ANTENNA AGAIN? IS THE MOUNT CENTER LINE AN ANTENNA AGAIN? NO, THAT'S THE, THE MOUNT THAT THE ANTENNAS ARE MOUNTED TO.

OKAY.

ARE THE ONES ON THE LEFT SIDE, THE SMALLER ONE.

SEE IF YOU LOOK AT THAT TOP, NOW YOU'VE GOT VERIZON AT THE TOP, YOU HAVE A SMALL LITTLE GUY.

MM-HMM ONE IN THE MIDDLE AND ONE ON THE RIGHT.

MM-HMM .

WHAT IS THE ONE ON THE LEFT THAT'S AN ANTENNA.

SO THEY'RE JUST DIFFERENT SIZE ANTENNAS.

OKAY.

SEE AGAIN, WE HAVE THE THING OF RELOCATING THREE COMPASS AND, AND WE'RE GONNA CLARIFY WHERE WE ARE, WHAT THAT MEANS, WHETHER THAT THEN YOU HAVE, BECAUSE THEN YOU HAVE INSTALLING AND YOU'RE POINTING AT THE SAME THING.

SO I, TO MY UNDERSTANDING, RELOCATING WOULD MEAN THAT YOU'RE MOVING THEM OUT OF THAT.

YES.

I, I, I THINK FOR CLARITY THEY'RE JUST POINTING TO THE ENTIRETY OF VERIZON'S INSTALLATION.

AND THEN ON THE SET, ON THE NEXT PAGE, C3, IT'S GOES INTO MORE DETAIL AS TO WHAT IS MOVING WHERE AND WHAT'S BEING INSTALLED.

WHERE CAN WE TRY TO KEEP IT? SO WHEN, WHEN ONE LOOKS AT THIS ONE UNDERSTANDS WITH A TWO WORD THING OF BEING KEPT IN THE, IN THE ANTENNA OR BEING MOVED TO A DIFFERENT PART OF.

SO THERE'S CLARIFICATION HERE.

THANK YOU.

THANK YOU.

OKAY.

WE'RE NOT GONNA GO DOWN RIGHT NOW.

WE'RE ONLY ON G SO WE'RE NOT GONNA GO DOWN THE REST OF THE DRAWING.

NOW WE'RE GONNA STICK WITH G WHAT'S HAPPENING TO THE EXISTING? OKAY, IT SAYS INSTALLING THREE, THREE HYBRID CABLES.

I DON'T HAVE THAT ON HERE.

DO I HAVE THAT ON THE DRAWING? YES.

WHY AM I NOT SEEING IT? I WAS JUST ON OVER HERE ON THE RIGHT.

I GOT IT.

SO WHERE ARE THE EXISTING, WHAT'S HAPPENING TO THE EXISTING SIX BY 12 HYBRID CABLES? NOTHING.

THEY'RE JUST ADDING THREE MORE.

OH, ARE THEY GONNA BE USED? UM, THAT WOULD, GIVEN HOW MANY PLACES THEY WENT TODAY.

AND SO HOW MUCH IS JUST LEFT? IT'S A REAL QUESTION.

'CAUSE WE HAVE A PART OF THE CODE THAT SAYS THINGS MUST BE REMOVED AND THAT THEY'RE INSTALLING NEW ANTENNAS.

THAT'S MY UNDERSTANDING IS NEW LINES WILL BE SET UP TO NEW ANTENNAS.

IF YOU LOOK AT E EXISTING, IT SAYS VERIZON FEEDLOTS ABOVE IT, IT SAYS INSTALLING THREE BY SIX HYBRID CABLES.

THEN IT SAYS YOU HAVE THREE SIX BY 12 HYBRID CABLES.

YOU'RE SAYING THOSE ARE STAYING CORRECT AND YOU HAVE 12 COAX CABLES.

SEVEN BY EIGHT.

YOU'RE SAYING THOSE ARE STAYING CORRECT.

OKAY.

SORRY.

I SAID I FEEL LIKE I'M SITTING ON THE FLOOR.

YOU ARE, YOU'RE SITTING IN AN INCREDIBLY LOW CHAIR.

THE ONE NEXT TO YOU IS HIGHER.

UM, OKAY, SO THAT ONE G AND G IS COMPLETE.

[01:00:02]

UM, BUT ACTUALLY WE'RE GONNA MARK TO GET CLAR, WE'RE GONNA MARK IT COMPLETE TO GET CLARIFICATION WHERE RELOCATING ANTENNAS WILL BE.

THAT'S WHAT I HAVE HERE.

OKAY.

H PROVIDE A COPY OF THE CERTIFICATE OF COMPLETION ISSUED BY THE TOWN.

OKAY.

YOU HAVE EXHIBIT E AND IT'S ANTENNA WORK AND RELATED INSTRUMENTS.

AND WE WENT OVER THAT ABOUT GETTING TO THE STRUCTURE.

SO WE NEED, OKAY, IF THE WIRELESS FACILITY IS BEING MODIFIED, I, I HAVE THIS COMPLETE CERTIFICATION.

THE SUPPORT STRUCTURE IS CAPABLE OF SAFELY HANDLING THE ADDITIONAL ANTENNA EQUIPMENT TO BE ADDED.

IF MR. SHEEN WAS HERE, BECAUSE WE HAVE TWO DIFFERENT HEIGHTS.

I THINK THAT'S WHAT I FOUND.

UM, JJJ, THE HEIGHT OF THE REPORT SAYS 96 FEET AND THE DRAWING SHOW 97 AND A HALF FEET.

IT REPORTS AS 98 FEET.

I'M SORRY, THE REPORT SAYS 98 FEET EXHIBIT A PAGE THREE, PAGE FIVE PAGE.

IT STARTS AT PAGE THREE, BUT PAGE FIVE, CAN WE RECONCILE THAT HEIGHT ANYWAY? IT'S A HALF FOOT INSTEAD OF A FOOT AND A HALF.

WELL, NO, THAT SAYS, SO THEN, THEN WE GO TO THE PLANS.

IT SAYS VERIZON ANTENNA CENTER LINE 98 FEET.

IT SAYS ON THE DRAWING EXISTING POLE IS 97 POINTS AND SIX.

IT SAYS VERIZON ANTENNA CENTER LINE.

I CAN ONLY TELL YOU WHAT I'M READING RIGHT HERE.

NO, NO, BUT I'M SAYING VERIZON ANTENNA CENTER LINE IS 98 FEET.

LOOK AT THE, ON THE PLAN.

I GOT WHAT? OH, YOU'RE SAYING GO TO PAGE FIVE BEFORE WE OVER HERE? NO.

GOING OVER HERE IT SAYS VERIZON.

I, I'M READING THIS REPORT WHICH SAYS THE TOWER IS 96 FEET AND THAT'S WHAT IT'S, TO ME THAT'S A SIX.

THAT'S NOT AN EIGHT.

THE TOWER IS 96 FEET.

RIGHT? VERIZON'S ANTENNA CENTER LINE IS 90.

SO I'M SAYING EXISTING 97.6 POLE.

THAT'S WHAT THIS DRAWING RIGHT HERE.

RIGHT HERE.

I HAD, I AM NOT DISAGREEING WITH YOU.

I'M SAYING, BUT VERIZON'S ANTENNA ARE, BUT THAT'S NOT WHAT THEY'RE TESTING TO.

THEY'RE WRITING IN THEIR REPORT THAT THE POLE IS 96 FEET HIGH.

THE POLE IS 96 FEET HIGH.

BUT THEN THE VERIZON'S EQUIPMENT IS, IS I UNDERSTAND WHAT YOU'RE SAYING IS ABOVE THE POLE.

I UNDERSTAND WHAT YOU'RE SAYING.

IT'S HIGHER THAN THE POLE.

THEIR INFORMATION, WE HAVE TO GO WITH WHAT THEY WRITE.

NO, BUT VERIZON'S ANTENNAS ARE ABOVE THE POLE.

I UNDERSTAND THAT.

SO THAT'S, THAT'S WHAT THE PICTURE IS.

SO THEY'RE ABOVE THE POLE.

SO THAT'S WHAT THEY'RE CERTIFYING TO.

VERIZON'S AT 10 IS THERE 98 FEET.

THEIR REPORT READS THE TOWER IS A 96 FOOT MONOPOLE TOWER DESIGNED BY ENGINEERED ENDEAVORS.

THAT'S WHAT THEY'RE WRITING.

I CAN'T SAY WHAT THEY'RE CERTIFYING OR NOT.

THEIR OWN FACTS ARE INCORRECT.

THEY NEED TO CORRECT THEIR FACTS BECAUSE ON YOUR DRAWINGS IT HAS TO BE THE SAME.

THE EXISTING POLE HAS TO BE EITHER 96 FEET OR THIS HAS TO BE 97.6.

NO, BECAUSE THEY'RE CERTIFYING THAT THE POLE CAN HANDLE THIS.

BUT THEY'RE CERTIFYING THAT VERIZON'S ANTENNAS ARE CENTER LINE 98 FEET, WHICH ARE, THEY'RE ATTACHED OFF THE TOP OF THE POLE.

THE POLE IS IS ONE HEIGHT.

THEN VERIZON'S MOUNT IS AT THE TOP OF THE POLE AND EXTENDS OFF.

OKAY.

IT SAYS STATISTICS PLEASE TO SUBMIT THIS STRUCTURAL

[01:05:01]

ANALYSIS REPORT TO DETERMINE THE STRUCTURAL INTEGRITY OF THE ABOVE MENTIONED TOWER.

THE AT TOWER THEY'RE SAYING IS 96 FEET.

AND I'M SAYING TO YOU, NO MATTER HOW MANY TIMES YOU WANT, TELL ME THAT THEY'RE, THEY'RE, THEY'RE TALKING ABOUT THE IT OFF.

NO MATTER HOW MANY TIMES YOU WANT TO TELL ME THAT THE MON THE MONOPOLE IS ONE THING, THE TENS OR ANOTHER, I'M GOING BY WHAT IS WRITTEN HERE.

I'M NOT FABRICATING ANYTHING.

I'M NOT MAKING ANYTHING UP.

THE STRUCTURAL ANALYSIS IS THIS POLE CAN HOLD THESE THINGS.

AND THE BASIS, THE FOUNDATION OF THEIR BASIS IS THAT THE POLE IS 96 FEET.

IF THEY WANT TO SAY THE SAME THING, THEN THEY SHOULD CHANGE THE PAGE AND HAVE IT READ 97.6.

BUT THE, THEY CAN'T SAY THE TOWER IS TALLER BECAUSE THE TOWER IS NOT TALLER.

THEY DO SAY THAT THE ANTENNAS ARE AT 98 FEET THEN DRAWING SHOULD ON PAGE FIVE DRAWING, THEN YOUR DRAWING SHOULD SAY 96.

THEY SAY RIGHT HERE, IT DOESN'T MATTER WHAT YOU, WHERE, WHERE THE, IT'S ON TOP OF IT.

YOU HAVE FACTS HERE THAT ARE NOT ACCURATE.

ONE OF THESE TWO HAS TO GO EITHER, THIS HAS TO GO ON THE DRAWINGS RIGHT HERE.

SO YOU'RE SAYING THAT THERE, WHICH PAGE ARE YOU TALKING ABOUT? I'M LOOK AT THIS FRONT PAGE OF THIS DRAWING RIGHT HERE.

SEE WHERE IT SAYS THAT 97 6.

YEAH.

AND THEN I'M LOOKING AT PAGE FIVE, WHICH SAYS THE POLE IS 96 FEET.

I SEE WHAT YOU'RE SAYING.

AND THEY NEED TO BE THE SAME.

I SEE WHAT YOU'RE SAYING.

IT'S NOT ABOUT THE INTENTS.

I SEE WHAT YOU'RE SAYING.

K IS COMPLETE, L IS COMPLETE.

WHY DID I NOT M YOU HAVE.

OKAY, PAGE 59.

OKAY.

PLEASE LOOK AT 59.

IT SAYS ANTENNA RADIATION CENTER LINE.

RIGHT.

SO I'M LOOKING TO, UH, MY QUESTION TO YOU, IS THAT CENTER LINE SUPPOSED TO BE THE CENTER HEIGHT OF THE ANTENNA? BECAUSE IT IS ON THE LAST ONE YOU GAVE IN AND THE ONE BEFORE.

YEAH.

NO, I SEE, I SEE EXACTLY WHAT YOU'RE LOOKING AT.

AND I DON'T HAVE AN ANSWER FOR YOU.

SO I WILL GET IT INTO, IF YOU LOOK AT WHAT I'M LOOKING AT IS ON PAGE 59, DONNA, IS THAT THE CENTER LINE OF THE ANTENNA? THE ANTENNAS DO NOT REFLECT THE HEIGHT HERE THAT THEY ARE WRITTEN TO BE ON THE DRAWINGS, THEREFORE THE ENTIRE NEAR LEVEL IS CANNOT BE.

SO ON THE DRAWINGS, THE VERIZON IS AT THE TOP T-MOBILE COMES NEXT DISH COMES ON THE BOTTOM AND AT AND T COMES BETWEEN T-MOBILE AND DISH.

ON THIS, THE HEIGHTS DON'T CORRESPOND.

AND THE LOCATION ON THE ANTENNA, UH, LOCATION OF THE ANTENNAS, DON MAY OR MAY NOT CORRESPOND.

SO PAGE TWO, NUMBER TWO, THIS IS C TWO AND THIS IS 59.

AND THEN IN ADDITION YOU HAVE AS NUMBER 25 SOMETHING WRITTEN AS UNKNOWN.

AND WE DON'T HAVE UNKNOWN ANTENNAS.

EVERYTHING HAS TO BE IDENTIFIED.

SO YEAH, I SEE WHAT THAT , WHEREAS YOU MAY HAVE THE ANSWER CORRECT TO THAT PARTICULAR QUESTION.

THE REST OF THE PUZZLE FALLS APART.

I, I THINK I, I THINK I SEE WHAT HAPPENED.

EVERYTHING SEEMS TO BE IN PLACE EXCEPT FOR I THINK THEY JUST TYPO BEEN 90 NOT SO.

AND THEN THAT UNKNOWN LOOKS LIKE THAT IN TURN.

[01:10:02]

THAT MAKES ALL THE NEAR INCOMPLETE WITH THE EXCEPTION OF THREE.

UM, O IS COMPLETE.

HERE WE GO AGAIN.

HERE WE NEED A PROFILE.

UM, ON Q WE NEED A DATE, MONTH, YEAR, SOMETHING IN THE NEXT ONE.

AND AGAIN, I BROUGHT THIS FENCE BACK TO THE BUILDING DEPARTMENT BECAUSE SOME OF THE THINGS THAT THEY POINTED OUT WERE NOT CORRECTED.

UM, HOWEVER, THE, WHAT DO YOU CALL IT, THINGS PUT ON IT ARE BETTER.

UM, THE, SO THE FENCE SURROUNDING THE COMPOUND WILL REMAIN THE SAME.

WE NEED A DESCRIPTION OF IT BECAUSE HALF OF IT IS ONE THING AND HALF IS ANOTHER.

AND NOW LADIES AND GENTLEMEN ONTO THE DRAWINGS.

UM, DO YOU HAVE THE COLOR OF THE APARTMENTS HERE? I THINK THEY PROBABLY ONLY HAVE THE COLOR OF THE NEW EQUIPMENT.

SO OKAY, COLOR.

UM, WE'RE GONNA HAVE TO DO SOMETHING ABOUT THE SIGNS.

'CAUSE EVERYTHING UP THERE IS CROWN AGAIN.

WHAT UM, WHERE DO YOU HAVE HERE AT THE, I GOTTA HAVE TO TEXT GABBY TO TELL THEM I'M RUNNING BACK.

WE HAVE A MEETING AT SIX 30.

I'M NOT GONNA BE ON IT.

WELL APPARENTLY NEITHER AM I .

I'VE GOT MEETINGS ALL DAY EXCEPT FOR WHEN I PLAYED BRIDGE.

OKAY.

OKAY.

SO WE DON'T ACCEPT WHAT YOU HAVE HERE AS EXISTING AT AND T EQUIPMENT.

LOOK AT PAGE C TWO.

LEFT, RIGHT SIDE, LEFT SIDE OF THE CODE.

OKAY, THE EXISTING AT T CABINET SLASH FENCE ON TOP IT SAYS AT T EQUIPMENT CABINETS, IF YOU LOOK AT THE LEFT OF THE POLE MM-HMM IT SAYS EXISTING AT T EQUIPMENT AND IT'S POINTING AT AN ANTENNA.

OKAY? SO I'M WRITING IDENTIFY WHAT SOMETHING IS NOT SIMPLY EQUIPMENT.

WHY IS THERE STILL A SPRINT EQUIPMENT

[01:15:01]

CHECK? DO YOU KNOW? UM, 'CAUSE IT HASN'T BEEN REMOVED.

I GUESS I BROUGHT THAT UPSTAIRS TO THE ATTENTION.

'CAUSE NOTHING CAN GO UP UNTIL THEY ABIDE BY THE LAW.

SO THIS IS EVERYBODY'S VESTED INTEREST TO HAVE IT REMOVED.

SO, UM, MAYBE, UM, WHAT YOU ALSO DON'T HAVE HERE IS ALL THE, I DON'T THINK YOU HAVE IT.

I DON'T SEE IT.

AND I ONLY KNOW IT BECAUSE I SAW IT TODAY.

IS THAT ALL THE ELECTRIC IS OUTSIDE HERE.

THIS IS WHAT I'M TALKING ABOUT.

AND IT'S NOT SHOWN ANYWHERE HERE.

UM, YOU MAY NOT BELIEVE THIS, BUT I REALLY DON'T LOVE DOING THIS.

THIS IS ALSO, LEMME JUST SHOW YOU ABOUT THE SIGNS.

THIS IS ALL YOU GOT HERE TOO.

OH, I HAVE TO CHANGE THIS.

AND THIS IS HANGING OUT THERE.

I MEAN THESE ARE THE PICTURES I BROUGHT UP UPSTAIRS.

THEY'RE GONNA GO OUT BECAUSE IT, THE PLACE LOOKS BETTER.

I'M AT MEETING RIGHT NOW.

BUT SEE THERE'S NO VERIZON SIGN.

THERE'S NOT.

UM, AND THESE ARE THINGS THAT THEY'RE GONNA, THEY TOLD THEM TO FIX LAST TIME BECAUSE YOU CAN EASILY PUSH THROUGH IF YOU'RE SMALL ENOUGH.

UM, AND THAT'S THE BOTTOM AND THAT'S OPEN HERE.

THIS IS STUFF YOU GUYS SHOULD CARE ABOUT.

I MEAN YOU MAY NOT, BUT YOU SHOULD.

UM, THE BACK IS, THE BACK IS NOT CAMOUFLAGE, BUT THIS IS WHAT I WAS TALKING ABOUT.

THIS IS ALL EXTERNAL.

IT SHOULD BE ON THE DRAWINGS METERS RIGHT HERE.

WELL, HERE'S A PICTURE.

AND WE GENERALLY WANT, WE ASK TO SEE EVERYTHING.

AND I'M NOT SEEING IT HERE.

I SEE THIS .

IT WOULD BE RIGHT HERE.

IT WOULD'VE BEEN RIGHT HERE BECAUSE WHEN I COME UP FROM THIS SIDE THAT'S BEHIND THE POLE AND THIS IS HERE AND WHAT IT IDENTIFIES AND IT DOESN'T ACTUALLY TELL ME THE DISH EQUIPMENT HEIGHT, THE EQUIPMENT PLATFORM, ALL OF THIS STUFF NEEDS TO, THE SPRINT EQUIPMENT SHELTER IS POINTING DOWN NOW IT'S POINTING ACROSS ELEVATION AT T EQUIPMENT CABINETS.

DO THEY HAVE A HEIGHT ANYWHERE HERE? YES, BUT IT HAS FENCE.

SO THE FENCE AND THE HEIGHT.

ARE YOU SAYING THE FENCE AND THE HEIGHT ARE THE SAME? THAT'S WHAT IT'S, THAT'S WHAT IT'S SAYING.

WE NEED THOSE SEPARATED BECAUSE WE HAVE PROBLEMS WITH SOME OF THE SITES GOING UP BEFORE.

AND, AND YOU KNOW THIS, SOME OF THE FENCES ARE SIX FEET AND THEY'RE SUPPOSED TO BE EIGHT FEET NOW.

SO WHEN THAT'S CONFUSING.

SO A DISH IS STILL NOT IN THERE.

I THOUGHT IT WAS UH, CONFIRM THAT PENDING EXISTING.

IT IS WHO OWNS THE TOWER? WHERE ARE YOU PUTTING THE SIGNS ON THIS? IF YOU LOOK AT C ONE, IT'S THE BOTTOM RIGHT CORNER.

SIGNAGE LOCATION.

THIS SIGNAGE LOCATION.

BUT THAT'S WHERE THEY'RE GOING.

IS THAT ON A GATE? IS WHAT IS THAT ON? IT'S A GATE, YEAH.

ACCESS GATE.

OKAY.

WE NEED IDENTIFICATION OF WHERE TO SIGN AND, AND IT, IT DOES SAY ACCESS GATE.

IN THE MIDDLE OF IT IT SAYS, OKAY, SO THAT WHOLE THING TO THAT SIDE WHERE THERE'S STILL ONLY A CROWN SIGN.

C 5.2 C 5 22.

[01:20:06]

HOW MANY TIMES HAVE PEOPLE HAD THIS SITE HERE WITH VERIZON? IT MANY TIMES.

HAVE WE BEEN HERE? MM-HMM .

I'M NOT SURE HOW MANY TIMES HAVE WE APPROVED IT.

MULTIPLE.

YES, THAT'S COMPLETED.

YES.

THERE'S NOT ONE VERIZON SIGN, NOT ONE.

THERE'S NOT ONE OF THE OTHERS EITHER.

THIS IS OUTRAGEOUS OF CROWN AND I DON'T THINK ANYBODY'S GOING UP ANYMORE TILL THESE THINGS ARE CORRECTED.

THAT'S AT LEAST MY HOPE.

NOT THE BUILDING DEPARTMENT.

BUT THIS IS WHEN WE TALK ABOUT THINGS BEING WRITTEN THAT DON'T HAPPEN.

IT'S LIKE THE LAST ONE.

THAT SITE IS, IS AWFUL.

SO, SO THIS IS INCOMPLETE.

THE SIGN IS COMPLETE.

UM, AND THEN WE, THE NEXT ONE IS COMPLETE.

AND THEN WE WENT OVER INSURANCE WITH FRANCIS.

AND I MOVE THAT WE, I MAKE A MOTION THAT WE JUST, UH, DETERMINE THIS AS INCOMPLETE.

SECOND.

ALL IN FAVOR? EXCUSE ME.

JUST LOUD ENOUGH SO THAT, YES.

OKAY.

ALL IN FAVOR? YES, YES, YES.

UNANIMOUS.

OKAY, SO GOING OVER IT.

ONE, THE CREDENTIALS ARE REQUIRED.

B, WHO OWNS THE PROPERTY DRAWINGS AND, AND MUST NO, AN APPLICATION MUST MATCH WHO OWNS THE POLE POSTAL IS, UM, C IS COMPLETE.

D IS COMPLETE.

E IS COMPLETE.

F WHO IS AP WIRELESS MUST READ ON BEHALF OF AND THE LEASES.

UM, WHO OWNS THE POLE? THEY NEED TO GIVE VERIZON PERMISSION.

G IS INCOMPLETE.

CLARIFY WHO'S RO WHERE CLARIFY WHERE RELOCATING ANTENNAS WILL BE WILL GO H INCOMPLETE NEEDED FOR THE SUPPORT FOR THE STRUCTURE.

I IS COMPLETE.

J IS INCOMPLETE.

RECONCILE THE DIFFERENCE IN HEIGHT BETWEEN 96 FEET AND 97.6 FEET OF THE POLE.

K IS COMPLETE.

THE F UM, L IS COMPLETE.

M IS COMPLETE.

N IS INCOMPLETE.

AND I'M WRITING RECONCILE RF REPORT ANTENNA HEIGHTS.

UM, SO THE THIRD PART OF THAT IS COMPLETE CERTIFICATE O IS COMPLETE.

WELL, YOU KNOW WHAT I MEAN WOULD BE THINGS WOULD NEAR RECONCILING.

YEAH.

YES, IT'S UM, P IS INCOMPLETE.

WE NEED A PROFILE.

Q IS INCOMPLETE.

GIVE US AN EXPECT DATE.

MONTH, YEAR.

R HIS INCOMPLETE DESCRIPTION OF THE OFFENSE IS REQUIRED.

S UM, COLOR OF THE APARTMENT IS IDENT.

IDENTIFY WHAT SOMETHING IS NOT SIMPLY EQUIPMENT DISH PENDING.

QUESTION MARK.

WHO OWNS THE TOWER? UM, I WROTE NEXT TO T INSTALL IT ALTHOUGH IT'S COMPLETE.

UM, U IS COMPLETE AND THE INSURANCE LAST ONE IS INCOMPLETE.

MUST STATE ADDITIONAL, ADDITIONAL INSURED.

OKAY, SO MEANWHILE I'M GONNA WRITE

[01:25:01]

THE NOTES ON THIS.

IF YOU CAN INITIAL, UM, I WILL GET IT SENT TO YOU TOMORROW 'CAUSE THE IT STAMPED FOR THE DAY.

LEMME GO BACK AND FIX THIS ONE.

THANK YOU EVERYBODY.

IT'S REALLY, I FROZE TO HEAT.

THEY DON'T GIVE US HEAT.

YEAH, THAT'S THE WAY THEY MAKE YOU THE INCENTIVIZED TO MAKE THE MEETING.

THEY'RE STILL, WE'RE NOT DONE.

I STILL HAVE TO DO THE LAST ONE.

I HAVE TO MAKE THE INITIALS ON THIS ONE AND THEN I CAN REALLY POSITION OF BEING THE ONE WHO WANTS TO ADJOURN.

OKAY, SO I STILL HAVE TO NOTE THIS.

OKAY, ON THIS ONE, THIS IS ON 6 0 9.

JUST TO GO OVER IT WITH YOU, MIKE.

6 0 9 A IS WE NEED CREDENTIALS PROVIDED.

ADDRESS NEEDED TO BE THE SAME THROUGHOUT ON B.

WE NEED WHOLE OWNER ON POSTAL ADDRESS SHEET AND BLOCK AND LOT FOR C.

THE ADDRESS ON THE APPLICATION VERSUS DRAWINGS IS DIFFERENT.

WE NEED THE SAME ADDRESS THROUGHOUT.

FOUR WAS COMPLETE.

F WE, I ACTUALLY WROTE SEVERAL THINGS HERE SO I NEED TO WRITE THEM OVER HERE.

SHOULD READ JENNIFER ON BEHALF OF ONE, TWO.

PROOF OF RELATIONSHIP OF GLOBAL SIGNAL CROWN.

THE PROPERTY OWNER MUST GRAB VERIZON.

OKAY, I THINK THAT'S IT.

IT'S A LITTLE LESS MESSY BUT NOT BY MUCH.

UH, G WAS COMPLETE H COMPLETE.

I COMPLETE J COMPLETE K, COMPLETE L UM, COMPLETE M COMPLETE.

UM, NEAR WAS INCOMPLETE.

YOU HAVE TO CLARIFY CLARIFICATION OF PAGE 47 AT 50 P.

UM, THREE WAS COMPLETE.

CERTIFICATION WAS COMPLETE.

OH WAS COMPLETE.

WE NEED A PROFILE FOR P PROPOSED SCHEDULE FOR INSTALLATIONS AND COMPLETION OF THE MODIFICATION PROPOSED.

UM, THIS IS Q SO WE NEED A TIMEFRAME.

UM, IF THE EXISTING ARE, THERE ARE TREES ON THE SIDE.

THE FENCE IS MULTIPLE HEIGHTS.

THE INTERIOR IS OVERGROWN AND FILLED, UH, WITH THE PERTINENT STRUCTURES.

THIS HAS TO BE ADDRESSED IN, IN R.

UM, THEN ON S THE COLOR OF THE PERTINENT STRUCTURES, THE TOWER OWNER.

UM, THE RF REPORT MUST MATCH THE DRAWING.

THERE ARE UM, CLIMBING SPOKES.

I HAVE TWO FOURS HERE.

THAT'S NOT GOOD.

DRAWINGS MUST REFLECT REALITY.

WHAT IS THERE THE CORRECT THE KEY ADDRESS ON DRAWING VERSUS APPLICATION, FENCE, HEIGHTS, MATERIALS OF ALL PROPOSED AND EXISTING ANTENNAS OF PCE AND APPARATUS.

THAT'S, AND SO THIS IS NINE.

[01:30:03]

OKAY, JUST WRITING THIS HERE LIKE THAT.

SO THEN T IS COMPLETE, U IS COMPLETE.

THE FIRST TWO BOXES OF INSURANCE ARE COMPLETE.

THE THIRD ONE IS NOT.

I HAVE TO DRAW ON THE THIRD ONE.

I'VE NEVER HAD ONE THERE.

BUT THAT'S REMOVED FROM IF ON.

THAT'S WHAT FRANCIS WAS SHOWING YOU AND YOU AGREED TO JUST TAKE, STRIKE THAT.

CORRECT.

AND IF YOU CAN PLEASE LOOK THIS OVER AND INITIAL A AWAY, WE CAN ADJOURN.

I CAN RUN TO THE NEXT MEETING.

WOO.

I THANK YOU BOTH.

I THANK YOU BOTH FOR MAKING THIS HAPPEN.

WHO'S THE COFFEE REALLY WON? NO, BUT I DRANK HALF OF IT AND I GOT WORRIED I'D KNOCK IT OVER.

OH, THAT'S WHY I PUT IT OVER THERE.

'CAUSE I GIVEN OUR, IT'S A NEW PLACE AND IT'S A HISPANIC OKAY.

THREE 13 CENTRAL AVENUE.

WE VOTED UNANIMOUSLY INCOMPLETE AND THIS MORNING AND ONCE HE'S DONE INITIALING, WE'LL MOVE TO ADJOURN AND WE'LL ASK MIKE TO PUSH ALL THE CORRECT BUTTONS.

MM-HMM .

AND WE'LL ASK MIKE TO PUSH ALL THE CORRECT BUTTONS ONCE WE ADJOURN.

SHUT THE OFF.

AND IT WAS NOT APPRECIATED THAT WHEN I WENT UPSTAIRS TO TALK TO THE BUILDING DEPARTMENT, THEY SHOWED ME THAT OTHER APPLICATION THAT THANK YOU.

I WILL MAKE SURE YOU HAVE COPIES TOMORROW, MA'AM.

THANK YOU.

I MAKE A MOTION TO ADJOURN.

DO I HAVE A SECOND? NO, I WANT TO STAY FOREVER.

.

ALL IN FAVOR? AYE.

AYE AYE.

OKAY.

WHAT TIME IS IT? IT IS SIX 16.

SIX 16.

CAN YOU STOP US FROM RECORDING AND HAVE TO DO THIS? IF YOU DON'T, UH, DON'T UNPLUG IT.